Siding progress, insulation complete

All the spray foam and batt insulation is done. Lots of progress on the siding, too. The entire back of the house and most of the playroom side are done. Front is being done last because we decided to change the front design a bit, but it should be done soon, too.

Front looks the same except the right side

More of a peek towards the playroom side

Playroom siding

Working their way up the right side

Back corner

Back is done

Garage ceiling spray foam (under Master BR)

Attic foam visible above the far wall and windows

Attic foam





Above the master bath