Tuesday, August 16, 2016

Drywall day 2

Second floor is done, progress on main floor today. They were working in the kitchen and family room when we stopped by so we didn't get pictures of those rooms. Here's what was easy to see.  Also, Matt was able to clear a blockage in the overflow drain for the pond over the weekend, and it already seems so much clearer (no significant rain the past week or two probably helps). If it looks jungle-y, that's because it is. We have mowers scheduled to do a clean up around the banks tomorrow.

Front entry and main floor hall. Study on the right,
dining room on the left.

Study

Dining room

Chaos in the family room

Upstairs, first bedroom on the left

From inside bedr



Grandmas' Room

Grandma's bathroom

Hallway to master




Jungle pond


1 comment:

  1. I think I saw a spot on one of the windows in my room. :) The house looks more and more amazing!

    ReplyDelete