Tuesday, August 16, 2016

Drywall day 2

Second floor is done, progress on main floor today. They were working in the kitchen and family room when we stopped by so we didn't get pictures of those rooms. Here's what was easy to see.  Also, Matt was able to clear a blockage in the overflow drain for the pond over the weekend, and it already seems so much clearer (no significant rain the past week or two probably helps). If it looks jungle-y, that's because it is. We have mowers scheduled to do a clean up around the banks tomorrow.

Front entry and main floor hall. Study on the right,
dining room on the left.

Study

Dining room

Chaos in the family room

Upstairs, first bedroom on the left

From inside bedr



Grandmas' Room

Grandma's bathroom

Hallway to master




Jungle pond


Monday, August 15, 2016

Drywall day 1

We're temporarily stalled on siding; waiting for the accent materials to arrive, I guess (shakes for the peak and board & batten for front porch/front wall of the garage). All of the horizontal lap siding is up and looks great.  Today they started hanging drywall - what a difference inside!  Most of the second floor was hung today and the crew was still working at 7 tonight when we left.

Front view from Thursday last week - lap siding is up on
the shed dormer and third car garage as well.

Side view

Master bedroom - looking towards the hallway

Master closet

Master bath

Mara's room

Mara's closet

Mara's room and door to buddy bath

Attic stairwell from above

Attic stairwell looking down from the landing

Tuesday, August 9, 2016

Siding progress, insulation complete

All the spray foam and batt insulation is done. Lots of progress on the siding, too. The entire back of the house and most of the playroom side are done. Front is being done last because we decided to change the front design a bit, but it should be done soon, too.

Front looks the same except the right side

More of a peek towards the playroom side

Playroom siding

Working their way up the right side

Back corner

Back is done

Garage ceiling spray foam (under Master BR)

Attic foam visible above the far wall and windows

Attic foam





Above the master bath



Sunday, August 7, 2016

Spray foam and siding continue

The batt insulation is done and spray foam (for attic and garage ceiling under the master) started yesterday. More siding is up at the back of the house - very excited to see that progress. We got a few more interior photos today before drywall goes up. We're not sure what day that will start but it should be soon.

Family room

Bedroom 1

Bedroom 2 (Mara's room)

Buddy bath between BR1 and BR2

Cutie

Grandmas' room

Grandmas' bath & closet

Laundry

Master

Master bath

Master shower. Linen on left, throne room on right.

Walk-through master closet

Master BR looking out towards hallway

Attic spray foam

Attic peak

Attic work in progress

Front-facing peak

Siding continues