Monday, August 15, 2016

Drywall day 1

We're temporarily stalled on siding; waiting for the accent materials to arrive, I guess (shakes for the peak and board & batten for front porch/front wall of the garage). All of the horizontal lap siding is up and looks great.  Today they started hanging drywall - what a difference inside!  Most of the second floor was hung today and the crew was still working at 7 tonight when we left.

Front view from Thursday last week - lap siding is up on
the shed dormer and third car garage as well.

Side view

Master bedroom - looking towards the hallway

Master closet

Master bath

Mara's room

Mara's closet

Mara's room and door to buddy bath

Attic stairwell from above

Attic stairwell looking down from the landing