Thursday, July 14, 2016

Windows and Rough-Ins

Framing is wrapping up. We are weather-dependent on the remaining structures and we've gotten just enough rain to stall on progress (back porch and deck).  The breakfast and playroom roofs are done now and windows were installed Monday.  The plumbing and HVAC rough-in work started this week, too.  We did a walk-through with our builder and an electrician on Wednesday afternoon to identify all the lights, switches, outlets and other power-related needs (whoa that was tiring).  The house passed a checkpoint inspection on Wednesday, too. Exterior doors will arrive soon.  We're also finalizing cabinetry and need to go work on flooring. Exterior changes won't be significant until siding goes up and the shingles are on the roof, and after that it will all be inside work. We'll get an exterior time lapse together at some point.

Current front view

Family room framing pre-windows and playroom roof

Corner fireplace framed

Upper window openings

View from Fireplace looking up to 2nd floor overlook

Blocking in the kitchen beam and the Grandmas' room

Inside Grandmas' room - bath on the right, closet on the left

Grandmas' room and bathroom window openings

The overlook view down into family room

The only safe way to have a toddler on site lately

Basement perimeter wall framing

Exercise room

Bonus closet space under the stairs

Inside study after windows were installed

Inside dining room windows and rough in stuff

Trying to lay out kitchen island

Master bedroom windows


Attic and HVAC rough in stuff

1 comment: