Thursday, July 7, 2016

Framing Day 20

Many small changes to the house, particularly on the inside.  Things are really starting to take shape.  You'll notice the inside is a bit cleaner and more finished than previous posts as many of the support 2x4s have been removed.  Also, most of the interior doors have been framed in addition to the final cutouts for just about all of the windows.  This phase of framing should wrap up tomorrow.

Front

View from top of driveway

Great room upper-window cut-outs

Butler's Pantry

Kitchen/Breakfast areas

View into pantry

Office from the dining room

Dining room from the office

2nd floor hallway

Left-front bedroom

Right-front bedroom (a.k.a. Mara's room)

Buddy bath

Laundry room/guest bedroom

Master

Master bath

Master closet/bedroom

Master bedroom

Stairway to attic

Attic

Attic ceiling

Access over master bedroom

Attic from master bedroom access

Front of the attic

Attic stairs down

Stairs down to basement

Rear basement wall (framed)

Outdoor storage area

View from corner of backyard

Back of the house

1 comment:

  1. Unreal how much progress has been made! Such pretty views out all of the windows! I'm impressed by the driveway. I can't believe they built up the ravine that was there. The house is just huge!

    ReplyDelete