Thursday, June 23, 2016

Framing Day 12

A variety of work happened today... Second floor ceilings, more work around the 2-story family room, and they started the exterior sheathing.  Matt is home (hooray!!) so we ventured inside and went upstairs for the first time. It's fun to see each bedroom, the hallway, the new laundry room. Still lots of work to come but it really feels like our house.

It was a pretty terrible day heat-wise, with high humidity. We were cranky just walking around to see how it looked.  We had storms last night and there is more rain coming down now. Tomorrow's forecast has a chance for more rain, too. Sad trombone.

Lots of pictures today but the cross-supports all over the place make it really hard to see if you don't already know what you're looking at. We're posting them anyway, if only for our ourselves - hopefully soon it will be easier to see what things are.


Exterior sheathing

Wrapped garages


























Family room

From the top of the stairs - Daddy and Mara are standing
near the overlook for the upstairs hallway

Bedroom 1 

A view into the master bedroom

Master bathroom 

Walk-through master closet

Master tray ceiling and triple window

Inside guest bedroom, laundry is on the right (can't really
see in photo), looking into hallway towards Bedroom 2

The overlook into the Family room - can't wait for there
to be a handrail for this, yikes.

Family room ceiling and upper windows

Inside study, looking across to dining room

Front hallway looking towards kitchen

Inside the double garage

1 comment:

  1. Wow! Amazing how fast it's going up. Just amazing. It looks hot and humid even in the photos...a little early for the HVAC to be up and running, though. ;)

    ReplyDelete