Tuesday, September 13, 2016

Trim day 8-9-10

Trim continues. Cabinets are pretty much done, but we did get photos of the handles. Materials are on site for masonry - stone on the front foundation and porch columns, fireplace wall. Sand for the mortar. Flagstone for the front porch surface. Lots of pictures, not a lot of brain power for words today.

Header over study opening for barn doors

Bookshelves

Full view of the book shelves

Stair rails starting

Playroom bench and storage cubbies

Mudroom bench started, there will be cubbies above

Mudroom "drop zone" for keys, chargers, etc.

Mudroom closet

Kitchen hardware 

Pantry shelving

2-story coffered ceiling in family room

Overlook railing

And overlook from second floor

Mara checking out the master closet

We each got a dresser built in, shelving and rods coming

Basement stairs down

Big stairs for a little girl

Hard to get a picture of these open shelves in the basement

Current rear view, AC unit near the retaining wall

Back corner

Pond side

2 AC units installed

Stone veneer material

Flagstone for the porch

Sand pile

Current front view


1 comment:

  1. Wow, wow, wow! I love it--love the stair rails with the white and wood trim details. Can't wait to see the barn door on the study. Kitchen hardware looks nice, simple, substantial and elegant. I gather that the front of the house will have a stone façade? Looking forward to walking it in November!!

    ReplyDelete